Current position:Home - Case - Industrial construction
Chiping Shed Grid Project of Chiping Xinfa Huayu Alumina Co., Ltd. Power Plant
Release time:2020-04-03 15:29:24      The number of clicks:349

Project introduction: Chipping Shed Grid Structure of Power Plant of Chiping Xinfa Huayu Alumina Co., Ltd. The project has a total length of 180 meters, a width of 100 meters, a horizontal projection area of 18,000 square meters, and the highest elevation of the roof is 40.968 meters. The two ends of the dry coal shed are closed with a grid frame, and the roof panel is a 1mm thick single layer aluminum magnesium manganese alloy plate.


Cases of interest
Previous:Tianjin Rongcheng Group Tangshan Special Steel Co., Ltd. South yard closure project grid project
Next:Anyang Iron and Steel Co., Ltd. West Site Fully Enclosed Project